Henkelman Construction, Inc. Business Projects
|
|
Sebring
Police Station
Historic Renovation
Owner: City of
Sebring
Date Completed: February 2007
This
project consisted of a historical renovation of the 5,400
square foot police station, which was at one time the City of
Sebring Post Office. The renovation included replacement of
windows, refinishing of the existing wood floors and the
original terrazzo floor in the lobby, etc.
|
Mountain Lake Estates Colony House
New Clubhouse Facility
Owner:
Mountain Lake Corporation
Date Completed: December 2006
 |
|
|

The residents of Mountain Lake Estates can now relax in the
lap of luxury with the successful completion of this 8,600
square foot clubhouse facility. The main building
included dining areas, a commercial kitchen, restrooms, sauna
and exercise areas. The project also included two new
cabanas and a new pool. This project had an aggressive
schedule of only eight months. |

|
Roadhouse Grill
New Restaurant
Owner: Investment
of South Florida, Corp.
Date Completed: October 2006
This
project consisted of an 8,000 square foot building with a bar
joist and built-up roof system, exterior stucco, and a custom
wood framed porch. Custom cedar trim woodwork was included
throughout. This facility is now a popular destination for
patrons in Sebring and surrounding areas.
|
|
Lakeland Ob-Gyn
Extensive Renovation and Addition
Owner: Hartog & Duboy Properties, Inc.
Date Completed: January 2006
The Lakeland Ob-Gyn project involved an extensive renovation
of the 10,000 square foot, two-story medical facility. This
project was special because the clinic remained open for
business during the entire renovation of all offices and exam
rooms for the Lakeland Ob-Gyn staff and Central Florida
Women’s Care. This required an extraordinary
amount of coordination between the owner and contractor.
|
 |
|
“I
would like to take this opportunity to thank you so much for the
wonderful job you did with the reconstruction and remodeling of
our office. We were impressed how all phases of construction
went so smoothly. During the planning stage, it was very easy to
communicate to you and your staff exactly what we wanted done.
The communication lines between you, the architect, and the
doctors in our office were superb…My staff and I have been very
impressed with the quality of your work from beginning to end.
But, a greater measurement is the feedback we have been
receiving on a daily basis from our patients.”
- Peter M. Alvarez, M.D |
|

“Since the beginning of
the project we have maintained a professional relationship and
forged a valued friendship. Your entire staff has worked
tirelessly in attending to our needs and ensuring a quality
completion to our project. From the initial planning to the
final walk-through, our communication has been
excellent. Your staff’s tireless efforts and long hours
enabled us to move in as scheduled and without interruption to
the scheduled appointments of our patients. This on-time move
was important for our patients.”
- Shirin Yasrebi, D.D.S.
|
Dr. Yasrebi Dental Office
New Dental Office
Owner: ASPN Real Estate, LLC
Date Completed: October 2005
This new 5,154 square foot, high-end pediatric dental office
is an asset to the community. State-of-the-art equipment and
entertainment systems make going to the dentist a joy for even
the youngest patients. The project included masonry walls with
split face block and a truss roof system with architectural
shingles. Stunning murals on the interior ceiling added to the
value of this successful project.

|
|
Goodyear Wesley Chapel
New Facility
Owner: RSB Development, Inc.
Date Completed: June 2005
New 4,890 SF Goodyear Tire Center. Project includes masonry,
wood trusses. This is a 10-bay full service tire center. Ten
(10) hydraulic car hoists, lube and air lines, each with hose
reels, were installed. Building includes restrooms,
tire-storage area, waiting area with hard tile floors and tool
room. Service area concrete floor system includes specialized
colored harder to resist chipping.
|

|

|
Dr. Paul Saari,
DDS
New
Dental Office
Owner: Dr. Paul Saari
Date Completed: January 2005
2,866 SF new masonry
dental office, wood trusses with Architectural shingles.
Unique colored ground face block entry with balance of
exterior being stucco. Extensive interior millwork which was
co-designed with the owner.
|
|
Solivita
Fire Station
New Facility
Owner:
Polk County
Board of County Commissioners
Date Completed:
December
2004
This 11,000
SF facility was constructed for Polk &
Osceola Fire & EMS. It
consisted of
a masonry
building with pre-engineered wood
trusses and clay tile.
The sitework included concrete paving and retention ponds.
|

|
|
Winter Haven Radiology
New Medical Office
Owner: Modular Solutions
Date Completed: October 2004
 |
|

This project involved the
remodel of an existing building for a new medical clinic.
It included lead lined MRI and x-ray rooms. A section of
the roof above the MRI machine was constructed so that it
could be removed in its entirety if the MRI machine needed to
be transported from the building.
|
Mack Farms
New Office
Building
Owner: Mack Farms
Date Completed: January 2004
6,400 SF office building – wood frame with standing seam metal roof and stucco exterior. Extensive site work and
parking areas for tractor trailers. Deceleration lane off of Rt 60 constructed.
|
|
 |

|
Law Office
of Gil Colon
New Office Building
Owner: Gil
Colon
Date Completed:
October 2003
Each floor
of this two story brick building was 2,619 SF. The first
floor was designed for lease space. The second floor was
designed for Owner occupancy, including marble, tile, and
hardwood floors. Extensive wood trim and real stone window
and door lintels further accentuated the prestigious
appearance of the building.
|
|
SunTrust
Bank Drive-Thru
New Building
Owner: SunTrust
Bank
Date Completed:
August 2003
1,000 SF
bank with metal roofing for drive-thru
banking service. The project also included a
3,000 SF canopy for drive - up customers.
|

|
|
(Formerly Robert G. Waters
Volkswagen)

Construction of the Volkswagen of America Showroom |
|
Central Florida Eurocars
New
Dealership
Owner: Central Florida Eurocars
Date Completed: January 2003
14,300 SF
facility
consists of a
new service
area, 1,600 SF
detail shelter,
8,500 SF of
showroom,
sales area,
and parts
department. Also included new parking areas
for new and pre-owned autos. Sloped glass curtain wall
system and stainless steel canopies are just a few of the
features.
|
|

New 4,370 SF dental office. Project
consisted of eight
treatment rooms, along with offices, a lab,
storage and sterilization rooms. Both job - specific
cabinets
and
extensive air, gas and vacuum lines
were installed.
|
Dr.
Abbott’s Office
New
Dental Office
Owner: Dr. Phillip Abbott
Date Completed: December
2002
“I am very pleased with my decision to use Henkelman
Construction for our new dental office. I found the process
was made much easier with the assistance of a knowledgeable
staff and sub-contractors. Their efforts to achieve our 100%
satisfaction have earned them great respect from not only
myself, but my staff as well. They have supplied us with both
a professional and comfortable working atmosphere."
–
P.E. Abbott,
DDS
|
Dr. Pepine's Adult & Pediatric Dermatology
New Office Building
Owner:
Dr. Marcie Pepine
Date Completed: August 2002
This project consisted of constructing a new 3,000 SF office
building. An aggressive schedule and
a very tight - fitting site made this project a challenge for the Project Team. The
owner was successfully relocated from
her existing business and was able to
commence operations at her
new office ahead of schedule.
|

|

|
Dr. Thompson's Animal
Hospital
New Animal Hospital
Owner: Christopher & Kim Thompson
Date Completed: August 2002
New construction of 4,000 SF
animal hospital. The cupola
was used as a light well to
allow natural light in the
building. Project included a
large waiting room/reception
area with cupola, three exam
rooms, state-of-the-art surgery
room, boarding area for cats
and dogs, Silikal Acrylic floor
system, paging/music system,
central vacuum system and a
shaded, fenced exercise yard.
|
[Home]
[About Us]
[Services] [Projects]
[Current
Projects] [Contact
Us]
Henkelman Construction, Inc.
1830 N. Crystal Lake Drive.
Lakeland, Florida 33801-5977
Office: 863.666.3575 Fax: 863.668.9529
Info@HCInc.net
© 2004
Henkelman Construction, Inc. Lic. No. CGC016989. All Rights
Reserved.
Henkelman
Perry McCall, LLC, a new joint venture formed to accommodate our
large Institutional projects for Central Florida.
Updated April, 2007.
|
|
|