Henkelman Construction, Inc. Business Projects

 


        
 

Sebring Police Station
Historic Renovation
Owner:  City of Sebring
Date Completed: February 2007

This project consisted of a historical renovation of the 5,400 square foot police station, which was at one time the City of Sebring Post Office.  The renovation included replacement of windows, refinishing of the existing wood floors and the original terrazzo floor in the lobby, etc.
 



Mountain Lake Estates Colony House
New Clubhouse Facility
Owner:  Mountain Lake Corporation
Date Completed: December 2006

   

The residents of Mountain Lake Estates can now relax in the lap of luxury with the successful completion of this 8,600 square foot clubhouse facility.  The main building included dining areas, a commercial kitchen, restrooms, sauna and exercise areas.  The project also included two new cabanas and a new pool.  This project had an aggressive schedule of only eight months.

 

 




 


Roadhouse Grill
New Restaurant
Owner:  Investment of South Florida, Corp.
Date Completed: October 2006

This project consisted of an 8,000 square foot building with a bar joist and built-up roof system, exterior stucco, and a custom wood framed porch.  Custom cedar trim woodwork was included throughout.  This facility is now a popular destination for patrons in Sebring and surrounding areas.

 


Lakeland Ob-Gyn

Extensive Renovation and Addition
Owner: Hartog & Duboy Properties, Inc.
Date Completed: January 2006

The Lakeland Ob-Gyn project involved an extensive renovation of the 10,000 square foot, two-story medical facility. This project was special because the clinic remained open for business during the entire renovation of all offices and exam rooms for the Lakeland Ob-Gyn staff and Central Florida Women’s Care. This required an extraordinary amount of coordination between the owner and contractor.
 

       

I would like to take this opportunity to thank you so much for the wonderful job you did with the reconstruction and remodeling of our office. We were impressed how all phases of construction went so smoothly. During the planning stage, it was very easy to communicate to you and your staff exactly what we wanted done. The communication lines between you, the architect, and the doctors in our office were superb…My staff and I have been very impressed with the quality of your work from beginning to end. But, a greater measurement is the feedback we have been receiving on a daily basis from our patients.”

- Peter M. Alvarez, M.D

 

 




“Since the beginning of the project we have maintained a professional relationship and forged a valued friendship. Your entire staff has worked tirelessly in attending to our needs and ensuring a quality completion to our project. From the initial planning to the final walk-through,  our communication has been excellent. Your staff’s tireless efforts and long hours enabled us to move in as scheduled and without interruption to the scheduled appointments of our patients. This on-time move was important for our patients.”


- Shirin Yasrebi, D.D.S.


 



 Dr. Yasrebi Dental Office

 New Dental Office
 Owner: ASPN Real Estate, LLC
 Date Completed: October 2005

This new 5,154 square foot, high-end pediatric     dental office is an asset to the community. State-of-the-art equipment and entertainment systems make going to the dentist a joy for even the youngest patients. The project included masonry walls with split face block and a truss roof system with architectural shingles. Stunning murals on the interior ceiling added to the value of this successful project.

        


   

 



Goodyear Wesley Chapel
 

New Facility
Owner:  RSB Development, Inc.
Date Completed: June 2005

New 4,890 SF Goodyear Tire Center.  Project includes masonry, wood trusses.  This is a 10-bay full service tire center.  Ten (10) hydraulic car hoists, lube and air lines, each with hose reels, were installed.  Building includes restrooms, tire-storage area, waiting area with hard tile floors and tool room.  Service area concrete floor system includes specialized colored harder to resist chipping.

 


     
 



 



Dr. Paul Saari, DDS

New Dental Office
Owner:  Dr. Paul Saari
Date Completed: January 2005

2,866 SF new masonry dental office, wood trusses with Architectural shingles.  Unique colored ground face block entry with balance of exterior being stucco.  Extensive interior millwork which was co-designed with the owner.

 


S
olivita Fire Station
New Facility

Owner: Polk County Board of County Commissioners
Date Completed: December 2004

This 11,000 SF facility was constructed for Polk & Osceola Fire & EMS.  It consisted of a masonry building with pre-engineered wood trusses and clay tile.  The sitework included concrete paving and retention ponds.
 

 

   

 

 

 

 




 


Winter Haven Radiology
New Medical Office
Owner:  Modular Solutions
Date Completed: October 2004

 





This project involved the remodel of an existing building for a new medical clinic.  It included lead lined MRI and x-ray rooms.  A section of the roof above the MRI machine was constructed so that it could be removed in its entirety if the MRI machine needed to be transported from the building.

 

 

 




Mack Farms

New Office Building
Owner:  Mack Farms
Date Completed:  January 2004

6,400  SF   office   building  –   wood  frame  with  standing  seam  metal  roof  and  stucco  exterior.  Extensive  site work and  parking areas for tractor trailers. Deceleration lane off of Rt 60  constructed.
 
 

 

 





 


Law Office of Gil Colon
New Office Building
Owner: Gil Colon
Date Completed:
October 2003

Each floor of this two story brick building was 2,619 SF.  The first floor was designed for lease space.  The second floor was designed for Owner occupancy, including marble, tile, and hardwood floors.  Extensive wood trim and real stone window and door lintels further accentuated the prestigious appearance of the building.

 




SunTrust Bank Drive-Thru
New Building
Owner: SunTrust Bank
Date Completed:
August 2003

1,000 SF bank with metal roofing for drive-thru
banking service.
The  project  also  included a
3,000  SF  canopy   for  drive - up  customers.
 

 

 


 


(Formerly Robert G. Waters Volkswagen)

 

 

 




Construction of the Volkswagen of America Showroom

 



Central Florida Eurocars
New Dealership
Owner: Central Florida Eurocars
Date Completed: January 2003

14,300 SF facility consists of a new service area, 1,600 SF detail shelter, 8,500 SF of showroom, sales area, and parts department.  Also included new parking areas for new and pre-owned autos.  Sloped glass curtain wall system and stainless steel canopies are just a few of the features.
 

 

 




New 4,370 SF dental  office.  Project consisted of   eight
treatment rooms, along with  offices, a lab, storage   and sterilization    rooms.   Both  job - specific  cabinets  and
extensive   air,    gas  and  vacuum  lines   were installed.


 



Dr. Abbott’s Office
New Dental Office
Owner: Dr. Phillip Abbott
Date Completed:
December 2002

“I am very pleased with my decision to use Henkelman Construction for our new dental office.  I found the process was made much easier with the assistance of a knowledgeable staff and sub-contractors.  Their efforts to achieve our 100% satisfaction have earned them great respect from not only myself, but my staff as well.  They have supplied us with both a professional and comfortable working atmosphere."

P.E. Abbott, DDS


 




Dr. Pepine's Adult & Pediatric Dermatology
New Office Building
Owner: Dr. Marcie Pepine
Date Completed: August 2002
 

This project consisted of constructing a new 3,000 SF office building.  An aggressive schedule and   a   very  tight - fitting   site    made this project a challenge for the Project Team.   The owner was successfully relocated from  her  existing  business and was able to commence operations at her new office ahead of  schedule.

 


           
     

 

 

 

 




 






 


Dr. Thompson's Animal Hospital
New Animal Hospital
Owner: Christopher & Kim Thompson
Date Completed: August 2002

New construction of 4,000 SF animal hospital.  The cupola was used as a light well to allow natural light in the building.  Project included a large waiting room/reception area with cupola, three exam rooms, state-of-the-art surgery room, boarding area for cats and dogs, Silikal Acrylic floor system, paging/music system, central vacuum system and a shaded, fenced exercise yard. 


 

 

[Home] [About Us] [Services] [Projects] [Current Projects] [Contact Us]
 

Henkelman Construction, Inc.
1830 N. Crystal Lake Drive.  Lakeland, Florida 33801-5977

Office: 863.666.3575  Fax: 863.668.9529
Info@HCInc.net
 

© 2004 Henkelman Construction, Inc. Lic. No. CGC016989. All Rights Reserved.
Henkelman Perry McCall, LLC, a new joint venture formed to accommodate our large Institutional projects for Central Florida.
Updated April, 2007.

                      Copyright © [2005]  [HENKELMAN CONSTRUCTION, INC.]. [Website Design By Lakeland Web]