Henkelman Construction, Inc. Church Projects




St. Ann Catholic Church
Sanctuary Renovation & Addition
Owner:  Diocese of Orlando
Date Completed: November 2006

This project consisted of a renovation and addition to the existing sanctuary.  New windows, exterior stucco and a metal tile roof system were installed, along with a new HVAC and fire sprinkler system.  The interior ceilings were constructed of stained tongue and groove wood.



 




24,000 SF Family Life Center features a gymnasium,
a  new  kitchen,   an  office  area,  a  library,  and  an
unfinished  future  classroom  area.
 



Grove Park Christian Church

New Family Life Center
Owner:
Grove Park Christian Church
Date Completed:
April 2004

“During our planning process, we talked with several contractors within and outside the local  area.  We kept returning to Henkelman because of their excellent reputation and their willingness to work with us in developing and improving on our ideas for the project.”

 -  Keith R. Boyd, Building Task Force

 

 



This  two  story  pre -engineered  metal   building  with
stucco exterior and tile roof contained a full basketball
court  and stage, along with a full  service kitchen and
dining  areas on the first floor, totaling 13,560 SF, and classrooms  on  the  5,380 SF  second  floor.
 

  First United Methodist Church of Sebring
  New Multi-Purpose Building

  Owner: First Methodist Church of Sebring
  Date Completed: September 2003

  











 

First Providence Church
New Fellowship Hall & Classrooms

Owner:  First Providence Church
Date Completed: May 2005

Construction of a new 3,500 SF Fellowship Hall & Classrooms. The project includes a new 900 SF Kitchen area with remodel of the existing Fellowship Hall area.

 


   










 

Covenant Presbyterian Church Of Sebring
New Sanctuary
Owner: Covenant Presbyterian Church Of Sebring
Date Completed: November 2002

New 13,900 SF Sanctuary. This multi-purpose masonry structure features a unique architectural design of a sixty-five foot tall bell tower.  The building also contains offices, a choir room, workroom, and a library.


 

 

 

 




 


This project involved the construction of a new 36,000 square foot multi-purpose building.  The exterior of the building consisted of a pre-fabricated metal building with a metal stud and stucco exterior.  The interior of the building featured a 6,000 square foot multi-use area for basketball, volleyball and large gathering surrounded by classrooms, offices, and a full kitchen.

   

    First Baptist Church of Bartow
   
New Fellowship Hall & Gymnasium
    Owner: First Baptist Church of Bartow
    Date Completed: February 2002














 

 

 


North Ridge Church of Haines City

New Multi-Purpose Building
Owner: North Ridge Church of Haines City
Date Completed:
December 1999
  
New 40,000 SF Multipurpose Building   with
a Gymnasium and Full Commercial Kitchen.
          






 


 















 


 

All Saint's Episcopal Church of Lakeland
Renovation of Parish Hall
Owner: All Saint's Episcopal Church of Lakeland
Date Completed: January 1996

Along  with  extensive renovations  to the  Parish  Hall, Parlor and Kitchen, in-house employees were called upon to perform Custom Design Cabinetry Work.  All finished woodwork including columns, shutters,  built-in cabinets,  and   wainscot  were  handmade  and stained by our Carpenters.

"The  work performed by Henkelman Construction was  done in a conscientious, professional manner.  Often Mr. Henkelman would suggest material or construction changes that would save money without affecting the quality of the final product."

Lawrence Maron, Junior Warden

 


Shepherd Road Presbyterian Church of Lakeland
Sanctuary Renovation
Owner: Shepherd Road Presbyterian Church of Lakeland
Date Completed:
December 1995

"We contracted  with Henkelman because their bid  was
reasonable, although   not the  lowest,  their  excitement
was high for our project and our committee  sensed their
company was one of high intensity in its work  ethic  and
high integrity in its promises and relationships.  We were
never disappointed."

- Eddie Spencer, Senior Pastor

 





 

 

 











 



First United Methodist Church of Haines City
Historic Renovation & Addition
Owner: First United Methodist Church of Haines City
Date Completed: February 1995

A new addition and historic  renovation to  the  existing
sanctuary  was  constructed  all   while   the    existing
sanctuary was in use. Extra care was taken to ensure the  site was  kept particularly clean  through  the  renovation  to  be  used by  the  owners.
 

 

[Home] [About Us] [Services] [Projects] [Current Projects] [Contact Us]
 

Henkelman Construction, Inc.
1830 N. Crystal Lake Drive.  Lakeland, Florida 33801-5977

Office: 863.666.3575  Fax: 863.668.9529
Info@HCInc.net
 

© 2004 Henkelman Construction, Inc. Lic. No. CGC016989. All Rights Reserved.
Henkelman Perry McCall, LLC, a new joint venture formed to accommodate our large Institutional projects for Central Florida.
Updated April, 2007.

                      Copyright © [2005]  [HENKELMAN CONSTRUCTION, INC.]. [Website Design By Lakeland Web]