Henkelman Construction, Inc. Church Projects
 |
St. Ann Catholic Church
Sanctuary Renovation & Addition
Owner:
Diocese of Orlando
Date Completed: November 2006
This
project consisted of a renovation and addition to the existing
sanctuary. New windows, exterior stucco and a metal tile roof
system were installed, along with a new HVAC and fire
sprinkler system. The interior ceilings were constructed of
stained tongue and groove wood.
|
|

24,000 SF
Family Life Center features a gymnasium,
a new kitchen, an office area, a library, and an
unfinished
future classroom
area.
|
Grove
Park Christian Church
New Family Life Center
Owner:
Grove
Park Christian Church
Date Completed:
April 2004
“During our planning process, we
talked with several contractors within and outside the
local area. We kept returning to Henkelman because of
their excellent reputation and their willingness to work with
us in developing and improving on our ideas for the project.”
- Keith R. Boyd, Building Task Force
|
|

This two story pre -engineered metal building with
stucco
exterior and tile roof contained a full basketball
court and
stage, along with a full service kitchen and
dining areas on
the first floor, totaling 13,560 SF, and classrooms on the
5,380 SF second floor.
|
First United Methodist
Church of Sebring
New Multi-Purpose Building
Owner: First Methodist Church of Sebring
Date Completed: September 2003

|
|
First Providence
Church
New Fellowship Hall & Classrooms
Owner: First Providence
Church
Date Completed: May 2005
Construction of a new 3,500 SF Fellowship Hall & Classrooms.
The project includes a new 900 SF Kitchen area with remodel
of
the existing Fellowship Hall area.
|

|
|
Covenant Presbyterian
Church Of Sebring
New Sanctuary
Owner: Covenant Presbyterian
Church Of Sebring
Date Completed: November 2002
New 13,900 SF Sanctuary. This multi-purpose
masonry structure features a unique architectural design of a
sixty-five foot tall bell tower.
The building also contains offices, a choir room, workroom,
and a library. |

|
|
This project
involved the construction of a new 36,000 square foot
multi-purpose building. The exterior of the building
consisted of a pre-fabricated metal building with a metal stud
and stucco exterior. The interior of the building
featured a 6,000 square foot multi-use area for basketball,
volleyball and large gathering surrounded by classrooms,
offices, and a full kitchen. |
|
|
First Baptist Church of Bartow
New Fellowship Hall & Gymnasium
Owner: First Baptist Church of Bartow
Date Completed: February 2002

|
|
North Ridge Church of Haines City
New Multi-Purpose Building
Owner: North Ridge Church of Haines City
Date Completed:
December 1999
New 40,000 SF Multipurpose
Building with
a Gymnasium and Full Commercial Kitchen.

|

|
|

|
|
All Saint's Episcopal Church of Lakeland
Renovation of Parish Hall
Owner: All Saint's Episcopal Church of Lakeland
Date Completed: January 1996
Along with
extensive renovations to the Parish Hall,
Parlor and Kitchen, in-house employees were called upon to
perform Custom Design Cabinetry Work. All finished
woodwork including columns, shutters, built-in cabinets,
and wainscot were handmade and
stained by our Carpenters.
"The work performed
by Henkelman Construction was done in a conscientious,
professional manner. Often Mr. Henkelman would suggest
material or construction changes that would save money without
affecting the quality of the final product."
- Lawrence Maron, Junior
Warden |
|
Shepherd Road
Presbyterian
Church of Lakeland
Sanctuary Renovation
Owner: Shepherd Road Presbyterian Church of Lakeland
Date Completed:
December 1995
"We contracted with Henkelman
because their bid was
reasonable, although not the
lowest, their excitement
was
high for our project and our
committee sensed their
company
was one of high intensity
in its
work ethic and
high integrity in
its promises and relationships.
We were
never disappointed."
- Eddie
Spencer,
Senior Pastor
|

|

|
First United Methodist
Church of Haines City
Historic Renovation & Addition
Owner: First United Methodist Church of Haines City
Date Completed: February 1995
A new addition and historic renovation
to the existing
sanctuary was constructed all while the existing
sanctuary was in use. Extra care was
taken to ensure
the site was kept particularly
clean through the renovation to be
used by the owners.
|
[Home]
[About Us]
[Services]
[Projects]
[Current
Projects] [Contact
Us]
Henkelman Construction, Inc.
1830 N. Crystal Lake Drive.
Lakeland, Florida 33801-5977
Office: 863.666.3575 Fax: 863.668.9529
Info@HCInc.net
© 2004
Henkelman Construction, Inc. Lic. No. CGC016989. All Rights
Reserved.
Henkelman
Perry McCall, LLC, a new joint venture formed to accommodate our
large Institutional projects for Central Florida.
Updated April, 2007.
|
|
|