Henkelman Construction, Inc. Metal Projects


 



 

Monier Lifetile
New Facility
Owner:  Monier Lifetile
Date Completed: March 2007

This project involved the installation of a 41,906 square foot pre-engineered metal building.  The interior included a 2-story masonry office, and a wheelchair lift to meet ADA requirements.  In order to meet the owner’s requested accelerated deadline and significantly increased scope of work, we accelerated our schedule to 10-12 hour days, 7 days a week.  The project was successfully completed on time.


 

 

Highland Center for Orthopaedics
New Medical Office
Owner:  Hale & Nixon, LLP

Date Completed: April 2006

This project consisted of a 10,000 SF Star Metal Building with metal wall panels on 3 sides and a masonry/stucco front.  The future of this growing practice was taken into consideration during the design phase, and therefore the building was constructed so that it can expand with 2 additional 5,000 SF sections off both ends, yielding a total of 20,000 SF.  The south half of the building operates as an orthopedic office and the north section is currently leased out as a physical therapy clinic.
 

 

       

 

“I am writing from the perspective of an Office Administrator.  I could not have asked for a better team to work with to complete the project.  We were given a finish date and the job was completed earlier than we had first expected.  This doesn’t happen with most new construction.  (The Project Manager and Superintendent) worked with me on getting everything that we wanted.  They cared enough to make suggestions to make the office better.  They met with us weekly at the jobsite so that we could see the project first hand and make decisions to keep the project on schedule.  They were professional and efficient and if I would ever work on another project I would want them to do the work.”

- Sandy Ray, Office Manager
 

 
 

 
 

Protel, Inc.
New Production & Warehouse Facility
Owner:  Protel, Inc.
Date Completed: August 2005

This new 36,000 SF facility consists of a Star Metal Building with split face block on three sides.  The building is utilized for production and storage.  The rear of the building features three roll up doors with a loading dock ramp.
 

 

“It appeared from the time we began this project that we would be faced with many obstacles.  We had no control over the tremendous hurricanes that came through Lakeland and caused devastation in our community.  The amount of damage and need for help to the residents set our project back, but you were still able to stay on top of things… Our building was a success and was completed within a time span reasonable and acceptable.”

-Regis “Skip” Mellon, President


 


Badcock Home Furniture
New Retail Facility
Owner: W. S. Badcock Corporation
Date Completed:
October 2003

New 29,400 SF pre-engineered metal building structure with masonry exterior walls.  This project was constructed on a 6.00 acre, fully developed site.  D.O.T. Right-of-Way work was required to rework medians, turn lanes, and drives.
 

      

     

 






 

Avon Park Recreation Center
New Facility
Owner:  City of Avon Park
Date Completed: March 2003

This project involved the installation of an 8,856 square foot pre-engineered metal building with split-face block on the exterior.  The interior consisted of a food prep area, a full basketball court, locker and restrooms.  The building was designed and built to meet Dade County hurricane requirements.  It was designated as a hurricane shelter, and successfully withstood three major hurricanes.
 


 

Crown Printing
New Facility
Owner: Mark and Edith Rust
Date Completed:
December 2001

New 17,000 SF pre-engineered metal building with a painted stucco exterior. 
Building consists of 7,000 SF of office space and 10,000 SF of print facility and warehouse space.
 

 

 

 

 

 

 

Harley Davidson of Lakeland
New Showroom and Garage
Owner: Don Huffman
Date Completed:
March 2001

22,000 SF showroom and garage. Special features include an underground exhaust system, exposed cathedral ceilings, ceramic and wood floors.  The retail space is a proud showpiece.

 

 

 

 

 

[Home] [About Us] [Services] [Projects] [Current Projects] [Contact Us]
 

Henkelman Construction, Inc.
1830 N. Crystal Lake Drive.  Lakeland, Florida 33801-5977

Office: 863.666.3575  Fax: 863.668.9529
Info@HCInc.net
 

© 2004 Henkelman Construction, Inc. Lic. No. CGC016989. All Rights Reserved.
Henkelman Perry McCall, LLC, a new joint venture formed to accommodate our large Institutional projects for Central Florida.
Updated April, 2007.

                      Copyright © [2005]  [HENKELMAN CONSTRUCTION, INC.]. [Website Design By Lakeland Web]